January 28, 2021

Katara Towers Hotel Contract Won By DSP DOHA

The DSP DOHA team is delighted to announce that it has won a substantial bid with IMAR Trading & Contracting to provide extensive metalworks alongside glass and glazing works for the iconic Katara Towers hotel in Lusail.

DSP DOHA’s involvement in the project will be a three-phased approach and will encompass the engineering, fabrication and installation of all metal and glass finishes. At the time of commission, some 34 different glass and mirror types and 20 different metal finishes will be required.

The impressive hotel’s design is an architectural translation of Qatar’s coat of arms and represent the traditional scimitar swords – which cross each other at the lower end of the structure to create a podium, upon which 36 stories will be built on either side. The concept is being brought to life by German design engineers King Consult.

METALWORKS
  • 18m-high cast iron hotel entrance gates
  • Polished textured copper wall and ceiling cladding
  • Brushed brass skirting
  • Matt black wrought iron with bronze details handrail
  • Polished brass bamboo effect decorative cladding
  • Dark gold polished brass ceiling cladding
  • Supper mirror finish black stainless steel ceiling cladding
  • Mirror finish bronze skirting
  • Metal doors and windows
  • Polished stainless steel railings
  • Metal cladding
  • Access panels
  • Sliding screens
  • Catwalk platform
  • Mashrabiya
GLASS AND MIRROR WORKS
  • Glass balustrades
  • Glazed doors
  • Glass shelves
  • Laminated smart glass partitions
  • Vanity mirrors
  • Glass blockwork with illuminate block of optical clear glass with LED
  • Back painted glass
  • Gold leaf toughened laminated glass
  • Etched patterned low iron mirrors

HOW CAN WE HELP WITH YOUR PROJECT?

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.